Skip to content
Speed to Power
Indicative. A national percentile — not a guaranteed connection date. How the grade is computed.

Operator Lens

A neutral benchmark on your own publications: redispatch cost, reinforcement-vs-flex, and slip risk. Built for planner conversations with TSO/DSO — methodology under every card, sources via data sources.

For DSO/TSO planners. Casual readers may prefer the map or headline numbers.

Per-DSO scorecard

One page per operator: silver-graph assets, gestreste stations en wat nog niet gewired is. Classificatie-grade, methodologie onderaan.

Operator feeds are paused. All three lenses depend on the live counter-trade, slip-risk, and substation-inference pipelines, which aren’t reachable right now. The map and headline numbers continue normally.

Counter-trade cost benchmark (30d)

Counter-trade benchmark feed is paused. See data sources.

Slip risk — rising redispatch, IBN years away

Slip-risk feed is paused. See data sources.

v1 substation-level stress (0 substations)

v1 inference data is paused. See data sources.

v1 disaggregates area-level P50 by PC6 share per substation. Phase 6+ replaces this with a full OSM-derived DC flow.

Operator Lens — DSO/TSO planner views · Speed to Power