Dutch grid congestion in four figures
Citable snapshot of the Dutch electricity grid. Every number is taken directly from the latest national snapshot (2026-05-21).
Consumption queue
Wachtrij afname
7.4 GW
MW requested by would-be consumers (data centres, electrification, EV hubs) that DSOs have not yet allocated.
Feed-in queue
Wachtrij opwek
5.4 GW
MW requested by would-be producers — solar farms, batteries in feed-in mode, wind projects.
MW unlocked once TenneT caps lift
Vrijgemaakt na TenneT cap-lift
21.3 GW
Total MW currently capped because a TenneT relief-year is pending. Lifts automatically when that year passes.
Municipalities without an F-grade
Gemeenten zonder F-grade
202 / 343 (59%)
Share of Dutch municipalities that don't have an F (closed) grade on either consumption or feed-in.
How to cite
Recommended wording, with the snapshot date included:
“As of 2026-05-21, 7.4 GW of consumption capacity sits in the Dutch waiting queue; the feed-in queue holds 5.4 GW. Source: Speed to Power, based on Netbeheer Nederland and TenneT disclosures.”
This page refreshes automatically after every national snapshot.