Screen your battery sites for grid-connection risk.

Paste your candidate postcodes and get a directional verdict per site — charge (import) vs discharge (export) risk, the two-layer DSO–TenneT trap, reinforcement outlook, and a confidence you can take to an IC. On neutral, public data.

Directional, not one-sided Two-layer-trap aware Confidence ≠ risk
or drop a CSV

Sample portfolio — paste your own sites above to replace it.

5 sites1Pursue2Flexible play1Hold1Avoid
grid snapshot 2026-05-21
1
Eemshaven NW9979
Het Hogeland · Groningen
Pursue
Charge
ALow
Discharge
BLow
merchant-first
High confidence
Open dossier
2
Flevo Zuid8243
Lelystad · Flevoland
Flexible play
Charge
BLow
Discharge
EHigh
export-constrained charging opportunityRelief far-off (~2031)
High confidence
Open dossier
3
Rotterdam Botlek3197
Rotterdam · Zuid-Holland
Flexible play
Charge
EHigh
Discharge
CMedium
import-constrained discharge opportunityRelief mid-term (~2028)
Medium confidence
Open dossier
4
Utrecht Lage Weide3542
Utrecht · Utrecht
Hold
Charge
CMedium
Discharge
BLow
two-layer DSO-TenneT trap Two-layer trapRelief mid-term (~2029)
Medium confidence
Open dossier
5
Brabant Oost5708
Helmond · Noord-Brabant
Avoid
Charge
FHigh
Discharge
EHigh
dual-constrained
High confidence
Open dossier
  • Reflects the HV feeding area (~229 TenneT feeding-buses), not your exact parcel — confirm the specific MV/LV connection with the operator.
  • Indicative public data (geen rechten te ontlenen): a relative grade, not a guaranteed connection date or available MW.
GridGrade Pro — export, alerts & API

Multi-site export, change alerts, and an API to screen your whole pipeline programmatically.

Upgrade to Pro
Battery Site Screener — Speed to Power · Speed to Power