Screen your battery sites for grid-connection risk.
Paste your candidate postcodes and get a directional verdict per site — charge (import) vs discharge (export) risk, the two-layer DSO–TenneT trap, reinforcement outlook, and a confidence you can take to an IC. On neutral, public data.
Directional, not one-sided Two-layer-trap aware Confidence ≠ risk
or drop a CSV
Sample portfolio — paste your own sites above to replace it.
5 sites1Pursue2Flexible play1Hold1Avoid
grid snapshot 2026-05-21- Reflects the HV feeding area (~229 TenneT feeding-buses), not your exact parcel — confirm the specific MV/LV connection with the operator.
- Indicative public data (geen rechten te ontlenen): a relative grade, not a guaranteed connection date or available MW.
GridGrade Pro — export, alerts & API
Multi-site export, change alerts, and an API to screen your whole pipeline programmatically.