Indicative. A national percentile — not a guaranteed connection date. How the grade is computed.

Raalte

Municipality· Overijssel·Updated 2026-05-21

Show on map
Consumption
Afname
P3700
E

How quickly a new consumer (data centre, factory, EV hub) can be connected in Raalte.

Feed-in
Opwek / teruglevering
P3400
F

How quickly a new producer (solar farm, wind project, battery in feed-in mode) can be connected in Raalte.

What is this grade?

A national percentile blending headroom, queue, the operator’s colour code, and reinforcement timing. It compares Raalte to every other Dutch feeding area in the same direction.Read the full method.