Indicative. A national percentile — not a guaranteed connection date. How the grade is computed.

Station Lelystad 150 (CBL) (tennet feeding area) has a Speed-to-Power grade of C for consumption and C for feed-in, updated 2026-08-04. See grid congestion, connection wait time and available capacity for Station Lelystad 150 (CBL).

Station Lelystad 150 (CBL)

TenneT feeding area·Updated 2026-08-04

Consumption
P8000
C

How quickly a new consumer (data centre, factory, EV hub) can be connected in Station Lelystad 150 (CBL).

Feed-in
P8500
C

How quickly a new producer (solar farm, wind project, battery in feed-in mode) can be connected in Station Lelystad 150 (CBL).

What is this grade?

A national percentile blending headroom, queue, the operator’s colour code, and reinforcement timing. It compares Station Lelystad 150 (CBL) to every other Dutch feeding area in the same direction.Read the full method.