Skip to content
Speed to Power
Indicative. A national percentile — not a guaranteed connection date. How the grade is computed.

Station Gorredijk 110

TenneT feeding area·Updated 2026-05-21

Show on map
Consumption
Afname
P3600
E

How quickly a new consumer (data centre, factory, EV hub) can be connected in Station Gorredijk 110.

Feed-in
Opwek / teruglevering
P4800
E

How quickly a new producer (solar farm, wind project, battery in feed-in mode) can be connected in Station Gorredijk 110.

What is this grade?

A national percentile blending headroom, queue, the operator’s colour code, and reinforcement timing. It compares Station Gorredijk 110 to every other Dutch feeding area in the same direction.Read the full method.

Continue exploring: full coverage · methodology · glossary