Skip to content
Speed to Power
Indicative. A national percentile — not a guaranteed connection date. How the grade is computed.

Station Bergum 110

TenneT feeding area·Updated 2026-05-21

Show on map
Consumption
Afname
P4500
F

How quickly a new consumer (data centre, factory, EV hub) can be connected in Station Bergum 110.

Feed-in
Opwek / teruglevering
P5400
F

How quickly a new producer (solar farm, wind project, battery in feed-in mode) can be connected in Station Bergum 110.

What is this grade?

A national percentile blending headroom, queue, the operator’s colour code, and reinforcement timing. It compares Station Bergum 110 to every other Dutch feeding area in the same direction.Read the full method.

Continue exploring: full coverage · methodology · glossary