Stedin (regional grid operator (dso)) has a Speed-to-Power grade of E for consumption and F for feed-in, updated 2026-07-31. See grid congestion, connection wait time and available capacity for Stedin.
Stedin
Regional grid operator (DSO)·Updated 2026-07-31
Consumption
P6500
E
How quickly a new consumer (data centre, factory, EV hub) can be connected in Stedin.
Feed-in
P6600
F
How quickly a new producer (solar farm, wind project, battery in feed-in mode) can be connected in Stedin.
What is this grade?
A national percentile blending headroom, queue, the operator’s colour code, and reinforcement timing. It compares Stedin to every other Dutch feeding area in the same direction.Read the full method.
Continue exploring: full coverage · methodology · glossary