Skip to content
Indicative. A national percentile — not a guaranteed connection date. How the grade is computed.

Enexis (regional grid operator (dso)) has a Speed-to-Power grade of F for consumption and F for feed-in, updated 2026-07-31. See grid congestion, connection wait time and available capacity for Enexis.

Enexis

Regional grid operator (DSO)·Updated 2026-07-31

Consumption
P7000
F

How quickly a new consumer (data centre, factory, EV hub) can be connected in Enexis.

Feed-in
P7700
F

How quickly a new producer (solar farm, wind project, battery in feed-in mode) can be connected in Enexis.

What is this grade?

A national percentile blending headroom, queue, the operator’s colour code, and reinforcement timing. It compares Enexis to every other Dutch feeding area in the same direction.Read the full method.

Continue exploring: full coverage · methodology · glossary